MonoBridge

Pricing each target four ways

The plan is priced as if everything lands, then again with side effects, with realistic odds, and with both, so the number you plan on is one a board will accept.

2-minute readUpdated October 2026

Read itFor owners. No formulas.For a CPA or CFO. Sources and tables.For an analyst. The formula and the policy.

One number would overstate the plan

If every target lands in full, the sample’s plan adds $2.00M. A board will discount that, because not every target lands and every move has side effects. So the plan does the discounting first, and shows its working.

The plan, priced

$2.00M added to value at sale

$2.00M$1.20M

Delivered. Every target hit in full, in sequence. The headline: $3.93M → $5.93M.

  1. Delivered$2.00M
  2. Side effects in$1.79M
  3. At its odds$1.31M
  4. Odds and side effects$1.20M

Slide from left to right: each step adds one more reason to be careful. The report also prints a fifth figure, each objective’s value times its odds summed ($1.38M), as a cross-check.

Alone, and in sequence

Each objective is also priced on its own, so you can see what it is worth if it were the only thing you did. Done in sequence, the later moves are usually worth a little more, because they act on a business the earlier moves have already improved.

Alone against in sequenceValue added by each move in the sample, $ at sale
  1. Pricing$620k
  2. Overhead$446k
  3. Gross margin$393k
  4. Retention$179k
  5. Growth$109k

How to read it. Switch tabs to compare. Overhead is worth $446k alone and $509k in sequence, because it comes after pricing has already raised revenue.

Where the odds come from

Each objective carries a probability of delivery and a cost. They are estimates for review, graded C, until the first quarter’s actual results replace them. In the sample:

MoveCostOddsExpected
Pricing$15k70%+$434k
Overhead$52k70%+$356k
Gross margin$37k70%+$314k
Retention$63k75%+$194k
Growth$286k50%+$82k

Cost is one-off. Expected is the in-sequence value times the odds. The plan’s one-off cost, including readiness items, is $477k.

  • Delivered. Targets applied in the chosen order; value after, less value before
  • Side effects in. Every target plus every declared coupling applied at once
  • At its odds. Each input moved from today by its probability times the distance to target, then the engine is re-run once
  • Board’s figure. The odds run with the couplings scaled by the same probabilities
  • Payback. A cash measure: one-off cost plus a year of run-rate against the annual EBITDA the objective adds in its delivery year, never against the value at sale

See it on a real report, or see it on yours.Download a sample reportSchedule demo